0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rekordwinter 2009/10: Wann bestehen Ansprüche auf Bauzeitverlängerung und Zusatzvergütung?

Author(s):
Medium: journal article
Language(s): German
Published in: UnternehmerBrief Bauwirtschaft, , n. 4, v. 33
Page(s): 8-12
Keywords:
DIN-Vorschriften delay in construction
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10067941
  • Published on:
    29/03/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine