Rehabilitation of the Ennepe Dam — Driving an inspection and drainage gallery using a tunnel boring machine
Author(s): |
Ulrich Moschner
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Wasserwirtschaft, n. 2018 |
Page(s): | 55-58 |
DOI: | 10.1007/s35147-018-0099-7 |
- About this
data sheet - Reference-ID
10248955 - Published on:
20/01/2019 - Last updated on:
20/01/2019