0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rehabilitation of the Ennepe Dam — Driving an inspection and drainage gallery using a tunnel boring machine

Author(s):
Medium: journal article
Language(s): English
Published in: Wasserwirtschaft, n. 2018
Page(s): 55-58
DOI: 10.1007/s35147-018-0099-7
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s35147-018-0099-7.
  • About this
    data sheet
  • Reference-ID
    10248955
  • Published on:
    20/01/2019
  • Last updated on:
    20/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine