0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Réhabilitation de la lagune de déballastage de Brest

Mise en oeuvre d'une solution innovante par enceinte active et stabilisation in situ

Author(s):


Medium: journal article
Language(s): French
Published in: Travaux, , n. 800
Page(s): 30-32
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10010838
  • Published on:
    20/11/2003
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine