0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Regression Modeling for Prediction of Earned Value Indexes in Public Building Construction Projects: The case of Ethiopia

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/23311916.2023.2220497.
  • About this
    data sheet
  • Reference-ID
    10777031
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine