0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Reconstruction of the Grenfell Tower fire—Part 5: Contribution to the understanding of the tenability conditions inside the apartments following the façade fire

Author(s): ORCID (Efectis France Saint Aubin Cedex France)
ORCID (Efectis France Saint Aubin Cedex France)
ORCID (Efectis France Saint Aubin Cedex France)
ORCID (Efectis UK‐Ireland Newtownabbey UK)
Medium: journal article
Language(s): English
Published in: Fire and Materials, , n. 8, v. 46
Page(s): 1083-1110
DOI: 10.1002/fam.3054

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/fam.3054.
  • About this
    data sheet
  • Reference-ID
    10673269
  • Published on:
    03/06/2022
  • Last updated on:
    10/12/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine