0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Reconstruction of a Damaged Steel Beam Bridge Using an Overhead Support System

Author(s):
Medium: journal article
Language(s): English
Published in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 2081
Page(s): 161-164
DOI: 10.3141/2081-17
Abstract:

Reconstruction of a bridge damaged by a backhoe on Interstate 494 and Xerxes Avenue in Minneapolis, Minnesota, in 2006 is discussed. The backhoe was extended above the clearance height of the bridge and, after extensively damaging the first five beams, became hung up under the bridge. The backhoe bucket had to be cut off before the truck and backhoe could be removed from under the bridge. The conventional method of supporting a bridge during reconstruction is reviewed and is then compared with the unique system that was used to support the remaining steel beams during reconstruction. The main design features and actual field methods are highlighted as well as a special lifting capability that was used to deal with a difficult field problem that arose.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3141/2081-17.
  • About this
    data sheet
  • Reference-ID
    10778195
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine