A real-time interaction platform for settlement control during shield tunnelling construction
Author(s): |
Xiongyao Xie
Qiang Wang Isam Shahrour Jun Li Biao Zhou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, October 2018, v. 94 |
Page(s): | 154-167 |
DOI: | 10.1016/j.autcon.2018.06.012 |
- About this
data sheet - Reference-ID
10191180 - Published on:
01/12/2018 - Last updated on:
01/12/2018