0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Real-time impact identification algorithm for composite structures using fiber Bragg grating sensors

This publication lists 25 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10253385
  • Published on:
    16/12/2018
  • Last updated on:
    16/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine