Rapid Replacement of a Movable Steel Railway Bridge
Author(s): |
John F. Unsworth
Christian Brown |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Transportation Research Record: Journal of the Transportation Research Board, January 2006, n. 1, v. 1976 |
Page(s): | 31-35 |
DOI: | 10.1177/0361198106197600104 |
Abstract: |
Railway bridges must be replaced rapidly to avoid detrimental effects on the operation of the railway. Detour routes are sometimes not available and often not an economical option. This paper describes the planning and techniques used in the rapid replacement of a movable steel railway bridge with minimal interruption to railway and marine traffic. |
- About this
data sheet - Reference-ID
10778263 - Published on:
12/05/2024 - Last updated on:
12/05/2024