0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantitative Assessment of Construction Risk

Author(s):
Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 2, v. 63
Page(s): 55-66
DOI: 10.1515/ace-2017-0016
Abstract:

Construction risk assessment is the final and decisive stage of risk analysis. When highly changeable conditions of works execution are predicted, risk should be evaluated in the favorable, moderate, and difficult random conditions of construction. Given the random conditions, the schedule and cost estimate of the construction are developed. Based on these values, the risk of final deadline delay and the risk of total cost increase of construction completion are calculated. Next, the charts of the risks are elaborated. Risk changes are shown in the charts and are analyzed in the range [1, 0].

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2017-0016.
  • About this
    data sheet
  • Reference-ID
    10476791
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine