0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantifying the interruption impact of activity delays in non-serial repetitive construction projects

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 6, v. 38
Page(s): 1-19
DOI: 10.1080/01446193.2019.1657922
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2019.1657922.
  • About this
    data sheet
  • Reference-ID
    10375445
  • Published on:
    21/09/2019
  • Last updated on:
    30/04/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine