Quantifying Schedule Delay Risk in Construction Projects: A Data-Driven Approach with BIM and Probabilistic Reliability Analysis

Author(s): ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Advances in Civil Engineering, , v. 2023
Page(s): 1-21
DOI: 10.1155/2023/5525655
Abstract:

Progress management is an important scheme of construction management. In practical affairs, many unknown factors may lead to potential project delays and make the schedule risky. To address this issue, this paper proposes a data-driven construction progress evaluation method that employs a probabilistic reliability analysis with BIM to effectively quantify the risk of schedule delay. By identifying critical tasks and probable failure conditions in uncertain environments, this method enables project managers to take proactive measures to keep their projects on schedule. Through our case study, we have demonstrated that the proposed method is highly effective in dynamically evaluating the project progress with both accuracy and efficiency. Besides, this system offers a more efficient way for managers to gather information, evaluate progress, and identify critical tasks, and provides project managers with a data-driven understanding of the risks and uncertainties related to project schedules, enabling them to take proactive measures to minimize the potential delays and ensure successful project delivery.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1155/2023/5525655.
  • About this
    data sheet
  • Reference-ID
    10732672
  • Published on:
    04/08/2023
  • Last updated on:
    04/08/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine