0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantifying costs of the productivity loss due to schedule changes in construction projects

This publication has been cited in the following 4 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10640630
  • Published on:
    30/11/2021
  • Last updated on:
    21/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine