Quantification and validation of uncertainties in subsoil models

Case study at the New Town Hall, Munich

Author(s): ORCID


Medium: journal article
Language(s): German
Published in: geotechnik, , n. 4, v. 47
Page(s): 269-281
DOI: 10.1002/gete.202400011
Abstract:

In infrastructure planning and construction, modeling the subsoil and its associated uncertainty is a fundamental task of geotechnical engineers. However, probabilistic methods and tools for quantifying and displaying the uncertainty of the subsoil models are rarely used in practice where deterministic interpolation dominates. In digital planning using Building Information Modeling (BIM), the probabilistic approach supports creating a discipline model in which the uncertainties of the spatial layer structure are statistically quantified to evaluate the georisks in the design and execution of civil constructions. This article presents a case study using a combination of Sequential Gaussian Simulation (SGSIM) and Sequential Indicator Simulation (SISIM) to account for uncertainties in soil layer geometry. In a case study at the Munich Town Hall, a geostatistical approach is applied and validated based on 70 bore logs, whereby the probabilities for the occurrence of a particular layer are spatially quantified. The case study illustrates the methodology‘s great potential and benefits compared to the conventional deterministic approach based on interpolation procedures.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/gete.202400011.
  • About this
    data sheet
  • Reference-ID
    10807503
  • Published on:
    17/01/2025
  • Last updated on:
    17/01/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine