Quality management of the concrete carriageway and intermediate slab installation in the tunnel / Qualitätsmanagement Betonfahrbahn und Zwischendeckenbau im Tunnel
Author(s): |
R. Blab
Walter Pichler R. Vergeiner |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2010, n. 4, v. 3 |
Page(s): | 365-377 |
DOI: | 10.1002/geot.201000031 |
Abstract: |
Based on the experience of former tunnel construction projects, the project management appointed an independent quality assurance consultant in addition to quality control by the site supervision for the construction of the intermediate slab and the concrete pavement of the new second tube of the Tauern Tunnel (direction Salzburg). In relation to the concrete pavement with exposed aggregate finish and the intermediate slab, quality assurance measures included the inspection of the suitability certificates and expert support in construction preparation and concreting. Compliance with the technical conditions of contract was also monitored continuously. |
Keywords: |
pavement layers concrete pavement exposed aggregate concrete pavement slab construction intermediate slab
|