0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quabbin Dike Built by Hydraulic Fill Method

Author(s): (Associate Civ. Engr., Met. Dist. Water Supply Comm. of Massachusetts, Boston, Mass.)
Medium: journal article
Language(s): English
Published in: Transactions of the American Society of Civil Engineers, , n. 1, v. 103
Page(s): 1396-1413
DOI: 10.1061/taceat.0004926
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/taceat.0004926.
  • About this
    data sheet
  • Reference-ID
    10596523
  • Published on:
    14/04/2021
  • Last updated on:
    14/04/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine