A 절리 암반터널 내 그라우팅 전·후의 암반 투수계수 및 그라우팅 주입량과 Q 시스템 항목들과의 상관관계 연구 (study on the correlation between the rock mass permeability before and after grouting & injection volume and the parameters of Q system in a jointed rock mass tunnel)
This publication has been cited in the following 1 other publication(s):
Advertisement
About this data sheet
Reference-ID 10394888
Published on: 26/11/2019
Last updated on: 26/11/2019
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.