0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Pyro processing cement kiln bypass dust: Enhancing clinker phase formation

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.conbuildmat.2020.120420.
  • About this
    data sheet
  • Reference-ID
    10542014
  • Published on:
    09/01/2021
  • Last updated on:
    19/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine