0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism

Author(s): (School of the Built Environment, University of Salford, Salford, UK)
(School of the Built Environment, University of Salford, Salford, UK)
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 4, v. 37
Page(s): 217-237
DOI: 10.1080/01446193.2018.1513656
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2018.1513656.
  • About this
    data sheet
  • Reference-ID
    10611660
  • Published on:
    18/06/2021
  • Last updated on:
    18/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine