0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective

This publication lists 44 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10702956
  • Published on:
    11/12/2022
  • Last updated on:
    15/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine