Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique
Author(s): |
Iris D. Tommelein
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, July 1998, n. 4, v. 124 |
Page(s): | 279-288 |
DOI: | 10.1061/(asce)0733-9364(1998)124:4(279) |
- About this
data sheet - Reference-ID
10156109 - Published on:
11/12/2018 - Last updated on:
11/12/2018