0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Puentes construidos por vanos sucesivos

Author(s):



Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 198, v. 46
Page(s): 91-102
Abstract:

Bridges built by consecutive spans

This workl presents a series of bridges designed by the technical office Proyectos y Estructuras, S.A. (PROES), whose construction was finished between 1990 and 1993. In all cases, the construction method used was that of consecutive spans and the construction firm was Castro Matelo S.A. The deck cross section typologies used were: box girder, slab or hollow slab and double joist slab. The maximum width of the platform in the works presented is 14,00 m and the maximum span length is 50 m.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076026
  • Published on:
    09/05/2018
  • Last updated on:
    09/05/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine