0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):

Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 217, v. 51
Page(s): 3-35
Abstract:

Multi-Span cable stayed bridges

As a result of the city expansion, the Cerda Square of Barcelona has suffered a deep transformation, from an old road interchange, into a new urban center. The works have involved the execution of 6721 m² of structures in an urban setting, with all the difficulties associated to it. In this paper, two of the most important actions carried out in the square from the structural viewpoint are described. The first one is the demolition of two continuous post-tensioned concrete bridges of 162 and 106 m total length, with maximum spans of 25 and 36 m. The second one is the construction of a pedestrian over crossing of 192.6 m length and 4.6 m minimum width, consisting of two composite concrete and steel box girder bridges of 40 m maximum length, monolithically connected to a composite cantilever.

Keywords:
bridges pedestrian bridges prestressed concrete demolition composite construction
Available from: ACHE - Asociación Española de Ingeniería Estructural
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075886
  • Published on:
    31/10/2018
  • Last updated on:
    31/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine