0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Public–Private Partnerships: A Fresh Risk-Based Approach to Water Sector Projects

Author(s):

ORCID
Medium: journal article
Language(s): English
Published in: Infrastructures, , n. 6, v. 8
Page(s): 102
DOI: 10.3390/infrastructures8060102
Abstract:

This study focused on the unbalanced relationships that can arise in current public–private partnership (PPP) risk management frameworks, especially in developing countries’ water sectors. Different stakeholders’ perceptions of risk management were examined by analyzing 15 interviews in Portugal and Mozambique. The hybrid method included semantic, descriptive statistic, content, and narrative analyses. To achieve the research objectives, the semi-structured interview transcripts were processed using quantitative and qualitative techniques to collate relevant actors’ opinions of risk management in PPP water projects. Five risk categories were identified. The interviewed experts ranked the financial risk category as the most crucial, followed by infrastructure, commercial, technical and operational, and context risks. However, when the transcripts were evaluated from a risk factor perspective, the context risk category unexpectedly jumped to first place. Twenty-five high-impact risk factors were isolated in the semi-structured interview contents. The top five most critical risk factors were political interference, no performance measurement baselines, an unfavorable private investment climate, nonpayment of bills, and water assets uncertain condition. The results comprise a fresh contribution to the existing knowledge about experts’ perceptions of PPP contract risks, including that prior research and specialists categorize financial risks as the most important. The findings further reveal that experts consider managing context risks to be the key factor in PPPs success in developing countries, as well as highlighting the need to explore these risks more fully in emerging economies’ water sectors. In addition, a complete risk management cycle is proposed based on the interviewed professionals’ opinions, in which risk assessment and risk treatment or mitigation measures are dealt with simultaneously.

Copyright: © 2023 the Authors. Licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10732232
  • Published on:
    21/06/2023
  • Last updated on:
    07/08/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine