0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Public–Private Partnership Risks in Conflict Zones and Solutions: Case Study for Afghanistan

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Infrastructure Systems, , n. 1, v. 27
Page(s): 05021001
DOI: 10.1061/(asce)is.1943-555x.0000599

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)is.1943-555x.0000599.
  • About this
    data sheet
  • Reference-ID
    10575367
  • Published on:
    27/02/2021
  • Last updated on:
    27/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine