Prototype Integrated Cost and Schedule Control System
Author(s): |
Osama Y. Abudayyeh
William J. Rasdorf |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Computing in Civil Engineering, April 1993, n. 2, v. 7 |
Page(s): | 181-198 |
DOI: | 10.1061/(asce)0887-3801(1993)7:2(181) |
- About this
data sheet - Reference-ID
10258604 - Published on:
29/12/2018 - Last updated on:
29/12/2018