0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Protecting Engineer Against Construction Delay Claims: NDC

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Management in Engineering (ASCE), , n. 3, v. 7
Page(s): 314-333
DOI: 10.1061/(asce)9742-597x(1991)7:3(314)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)9742-597x(1991)7:3(314).
  • About this
    data sheet
  • Reference-ID
    10374138
  • Published on:
    29/08/2019
  • Last updated on:
    29/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine