0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Proposing a Lean-Optimized Scheduling Model of Mixed-Flow Prefabricated Component Production in Off-Site Construction

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jcemd4.coeng-14393.
  • About this
    data sheet
  • Reference-ID
    10784377
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine