Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators
Author(s): |
Tatsiana Haponava
Saad Al-Jibouri |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), April 2012, n. 2, v. 28 |
Page(s): | 140-149 |
DOI: | 10.1061/(asce)me.1943-5479.0000078 |
- About this
data sheet - Reference-ID
10372085 - Published on:
29/08/2019 - Last updated on:
29/08/2019