0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Projekt Pumpspeicherkraftwerk Limberg III – besondere Herausforderungen an die Logistik sowie die Vortriebssysteme einer Großbaustelle im Hochgebirge

Author(s):


Medium: journal article
Language(s): German
Published in: Geomechanics and Tunnelling, , n. 5, v. 15
Page(s): 478-490
DOI: 10.1002/geot.202200031
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.202200031.
  • About this
    data sheet
  • Reference-ID
    10696094
  • Published on:
    10/12/2022
  • Last updated on:
    10/12/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine