Project Resource Input Optimization Problem with Combined Time Constraints Based on Node Network Diagram and Constraint Programming
Author(s): |
Feng Kong
Jinliang Guo Xiao Lv |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 2021, n. 12, v. 147 |
Page(s): | 04021163 |
DOI: | 10.1061/(asce)co.1943-7862.0002192 |
- About this
data sheet - Reference-ID
10629883 - Published on:
01/10/2021 - Last updated on:
01/10/2021