0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 223-226, v. 53
Page(s): 167-173
Abstract:

General work schedule

In this chapter the various stages of the project are described in some detail, including the corresponding planning, with particular attention paid to the preliminary stages and facilities for the project. Details are also given of the alterations made during the execution of the works at the Algeciras basin. Finally, a breakdown of the planning for the operations at sea is included, and the controls built into the overall scheduling are described.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075843
  • Published on:
    25/10/2018
  • Last updated on:
    25/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine