0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Profiling causative factors leading to construction project delays in the United Arab Emirates

This publication has been cited in the following 39 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576559
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine