0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Professionals’ views of material wastage on construction sites and cost overruns

Author(s):

Medium: journal article
Language(s): English
Published in: Organization, Technology and Management in Construction, , n. 1, v. 5
Page(s): 747-757
DOI: 10.5592/otmcj.2013.1.11
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5592/otmcj.2013.1.11.
  • About this
    data sheet
  • Reference-ID
    10411671
  • Published on:
    12/02/2020
  • Last updated on:
    12/04/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine