Productivity improvement of precast shop drawings generation through BIM-based process re-engineering
Author(s): |
Tushar Nath
Meghdad Attarzadeh Robert L. K. Tiong C. Chidambaram Zhao Yu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, June 2015, v. 54 |
Page(s): | 54-68 |
DOI: | 10.1016/j.autcon.2015.03.014 |
- About this
data sheet - Reference-ID
10190537 - Published on:
07/12/2018 - Last updated on:
07/12/2018