0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Process planning methodology: dynamic short‐term planning for off‐site construction in Slovenia

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 2, v. 25
Page(s): 143-156
DOI: 10.1080/01446190601026494

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446190601026494.
  • About this
    data sheet
  • Reference-ID
    10207320
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine