Process Model for Administrating Construction Claims
Author(s): |
M. Asem U. Abdul-Malak
Mustafa M. H. El-Saadi Marwan G. Abou-Zeid |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), April 2002, n. 2, v. 18 |
Page(s): | 84-94 |
DOI: | 10.1061/(asce)0742-597x(2002)18:2(84) |
- About this
data sheet - Reference-ID
10372392 - Published on:
29/08/2019 - Last updated on:
29/08/2019