0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A procedure for bridge visual inspections prioritisation in the context of preliminary risk assessment with limited information

Author(s): ORCID (Department of Civil and Environmental Engineering, University of Perugia, Perugia, Italy)
ORCID (Department of Structural Mechanics and Hydraulic Engineering, University of Granada, Granada, Spain)
ORCID (Department of Civil and Environmental Engineering, University of Perugia, Perugia, Italy)
ORCID (Department of Civil and Environmental Engineering, University of Perugia, Perugia, Italy)
Medium: journal article
Language(s): English
Published in: Structure and Infrastructure Engineering
Page(s): 1-27
DOI: 10.1080/15732479.2023.2210547
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/15732479.2023.2210547.
  • About this
    data sheet
  • Reference-ID
    10725356
  • Published on:
    30/05/2023
  • Last updated on:
    02/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine