0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Problems posed to a Moroccan hydroelectric facility inlet tunnel by the presence of gypsum

Author(s):

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , n. 3, v. 6
Page(s): 325-335
DOI: 10.1016/0886-7798(91)90144-s
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/0886-7798(91)90144-s.
  • About this
    data sheet
  • Reference-ID
    10112646
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine