0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Problems of dryer-kiln combination operations

Author(s):
Medium: journal article
Language(s): Spanish
Published in: Materiales de Construccion, , n. 59, v. 5
Page(s): 33-39
DOI: 10.3989/mc.1955.v05.i059.2471
Abstract:

Se discute, en este artículo, la construcción de un secadero, unido directamente a un horno túnel, sin puertas intermedias. Se presta atención al problema de la recuperación de calor y a la dificultad de controlar el flujo de gases desde el horno al secadero.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3989/mc.1955.v05.i059.2471.
  • About this
    data sheet
  • Reference-ID
    10746487
  • Published on:
    07/12/2023
  • Last updated on:
    07/12/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine