0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Probability of change orders and the effect on cost and schedule for new public school buildings

This publication has been cited in the following 7 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576756
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine