Probabilistic Duration Estimation Model for High-Rise Structural Work
Author(s): |
Hyun-Soo Lee
Jae-won Shin Moonseo Park Han-Guk Ryu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 2009, n. 12, v. 135 |
Page(s): | 1289-1298 |
DOI: | 10.1061/(asce)co.1943-7862.0000105 |
- About this
data sheet - Reference-ID
10164200 - Published on:
11/12/2018 - Last updated on:
11/12/2018