0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Probabilistic approach of pre-estimating life-cycle costs of road tunnels

Author(s): ORCID (Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki, Greece)
(Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki, Greece)
ORCID (EGNATIA ODOS SA, Thessaloniki, Greece)
Medium: journal article
Language(s): English
Published in: Structure and Infrastructure Engineering, , n. 12, v. 20
Page(s): 1-16
DOI: 10.1080/15732479.2023.2165120
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/15732479.2023.2165120.
  • About this
    data sheet
  • Reference-ID
    10708442
  • Published on:
    21/03/2023
  • Last updated on:
    10/11/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine