0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Prevention of the ground subsidence by using the foot reinforcement side pile during the shallow overburden tunnel excavation in unconsolidated ground

This publication has been cited in the following 7 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10089638
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine