0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

This publication lists 5 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10761647
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine