Premature Start Impact Analysis Tool: Preventing Unintended Construction Interruptions and Associated Impacts

Author(s): (Associate Professor, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, Austin, TX 78712 (corresponding author).)
(Assistant Project Manager, BCCI Construction Company, Inc., 150 E. Dana St., Mountain View, CA 94041.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 11
Page(s): 04519005
DOI: 10.1061/(asce)la.1943-4170.0000291
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000291.
  • About this
    data sheet
  • Reference-ID
    10579916
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine