Premature Construction Start Interruptions: How Awareness Could Prevent Disputes and Litigations

Author(s): (Graduate Student, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301 E Dean Keeton St. Stop C1752, Austin, TX 78712-1094.)
(Associate Professor, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301 E Dean Keeton St. Stop C1752, Austin, TX 78712-1094 (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 9
Page(s): 04516016
DOI: 10.1061/(asce)la.1943-4170.0000210
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000210.
  • About this
    data sheet
  • Reference-ID
    10579834
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine