Prefabrication supply chains with multiple shops: Optimization for job allocation
Author(s): |
Chung Ho
Yong-Woo Kim Zelda B. Zabinsky |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, April 2022, v. 136 |
Page(s): | 104155 |
DOI: | 10.1016/j.autcon.2022.104155 |
- About this
data sheet - Reference-ID
10657248 - Published on:
17/02/2022 - Last updated on:
17/02/2022