0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Prefabricación de puentes de gran luz. El puente de Alcoy

Author(s):


Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 170, v. 40
Page(s): 115-124
Abstract:

Prefabrication of bridges with a big span. The Alcoy's bridge

We describe several solutions to prefabricate span bridges decks biggers than 45 m. The most important piece of engeneerring, the Alcoy stayed bridge with only one pier and 108-132 m of span was prefabricated with longitudinal elements which weight is less than 60 t. by PACADAR's Company and made in a record time reaching the 96 m of deck in 20 days of work. You can find enclosed aspects about the project and fabrication of this piece of engineering. We also include projects of two stayed bridges, with different solutions of the above mentioned and one continuous deck with variable section and 70 m of span totally prefabricated.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076364
  • Published on:
    23/02/2019
  • Last updated on:
    23/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine