Predictive Model of Temperature Regimes of a Concrete Gravity Dam during Construction: Reducing Cracking Risks

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Buildings, , n. 8, v. 13
Page(s): 1954
DOI: 10.3390/buildings13081954
Abstract:

In consideration of the mild climatic conditions of North Vietnam with average monthly air temperatures ranging from 15 °C in winter to 26.5 °C, this study analyzes the regulation of the temperature regime and thermally stressed state of a concrete gravity dam made of rolled concrete. Despite the favorable weather conditions, there remains a risk of thermal cracking, necessitating the presentation of crack-formation models from different countries to assess and mitigate the risk of cracking through the adjustment of construction conditions. The study has developed a predictive model for the temperature regime and thermally stressed state of a layer-by-layer concrete mass under the given construction conditions using the factor-analysis method. Regression equations were then derived from the factorial experiment to quantify the responses of the maximum temperature and maximum stress in the concrete mass. The numerical finite-element method using the Midas Civil software package was employed to calculate the temperature regime and thermally stressed state of the concrete mass. To validate the mathematical predictive model, it was tested on the Ban Lai gravity dam in North Vietnam. The dam, which was constructed from rolled concrete and stands 56 m tall, was selected as the object in this practical example. The results obtained from applying the predictive model were compared to the results obtained from numerical calculations of the dam under construction, as well as the findings from field observations. These results were found to be in good agreement, indicating the effectiveness of the predictive model. Furthermore, an evaluation of the potential for temperature cracking of the concrete during the construction period was conducted.

Copyright: © 2023 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10737472
  • Published on:
    02/09/2023
  • Last updated on:
    14/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine